Union Terminal’s restoration

After years of planning, design work and thorough probing and analysis, construction work on Union Terminal began in earnest in July 2016 and finished in November 2018. The restoration of Union Terminal required a keen understanding of science, technology, engineering, mathematics and history as modern construction and engineering techniques blended with early 20th-century materials and design.

UT-Slider-1
previous arrow
next arrow
Videos on Union Terminal’s restoration

Check out our YouTube channel, with videos that document every stage of Union Terminal’s historic restoration.

Take a 3D tour of Union Terminal’s interior

As teams prepared for Union Terminal’s restoration, they commissioned a laser scan of the building and a 3D model that was used by architects and designers during the restoration. Click on the links below to take an interactive look inside the walls of Union Terminal.

Building Exterior
Steel Structure
Rotunda